In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the consequent rebound is measured. For a safe pile, the net settlement (i.e. total settlement minus rebound) per tonne of test load should not exceed

3.
A short column 20 cm × 20 cm in section is reinforced with 4 bars whose area of cross section is 20 sq. cm. If permissible compressive stresses in concrete and steel are 40 kg/cm² and 300 kg/cm², the Safe load on the column, should not exceed

5.
If Sb, is the average bond stress on a bar of diameter ‘d’ subjected to maximum stress ‘t’, the length of the embedment ‘l’ is given by