71. Relationship based on unrelated level of activity and past data of cost is measured with help of
72. Model which states decline in extra time needed to produce last unit, every time for cumulative quantity of doubled units produced is classified as
73. A helpful technique, for accurate forecasts about costs to be incurred in future is a part of
74. In specification analysis, assumptions related to residuals states must be
75. Deviations between estimated regression line and vertical deviations are classified as
76. In regression analysis, if observed cost value is 50 and predicted cost value is 7, then disturbance term will be
77. Number of observations in regression analysis is considered as
78. Estimation of cost functions, an ignoring information from all points but considering two observation points can be classified as
79. Graphical representation of cost driver data and costs is considered as
80. Evaluation criteria of regression equation must be considered as
Read More Section(Costing)
Each Section contains maximum 100 MCQs question on Costing. To get more questions visit other sections.