101. Changes made periodically to a system, after its implementation, is known as system
102. The first step in systems Development Life Cycle is
103. Nassi - schneiderman charts
104. Which of the following tools is not used in modeling the new system?
105. A design that consists of a hierarchy of modules; each module has a single entry and a single exit subroutine, is known as
106. Rapid prototyping proves the quality of a design by
107. The black-box concept:
108. A system investigation may result from
109. Graphic representation of the control logic of processing functions or modules representing a system, is known as:
110. Which of the following is an integrated collection of data with minimum redundancy, so that different applications can use the required data.
Read More Section(System Analysis and Design)
Each Section contains maximum 100 MCQs question on System Analysis and Design. To get more questions visit other sections.