21. The systems conversion technique of totally removing the existing system and immediately implementing the new system is called a
22. Which of the following statements is not true
23. The data base be prepared until
24. The system study project includes
25. Which of the following is not a part of a Data Flow Diagram?
26. The first step to the system study project is to
27. The data stored on a tape or disk file may be recorded in a report form described as
28. In Data structure, main characteristic of "ring" is :
29. Which of the following control structures is used in every program?
30. A system design is said to be functionally modular if
Read More Section(System Analysis and Design)
Each Section contains maximum 100 MCQs question on System Analysis and Design. To get more questions visit other sections.