1. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
2. Capacity of a slip siding is ________
3. Normal condition of automatic stop signal is ________.
4. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
5. The speed of a Trolley is
Read More Section(Indian Railway)
Each Section contains maximum 70 questions. To get more questions visit other sections.
- Indian Railway - Section 1
- Indian Railway - Section 2
- Indian Railway - Section 3
- Indian Railway - Section 4
- Indian Railway - Section 5
- Indian Railway - Section 6
- Indian Railway - Section 7
- Indian Railway - Section 8
- Indian Railway - Section 9
- Indian Railway - Section 10
- Indian Railway - Section 12
- Indian Railway - Section 13