41. Signals are normally located to the ________ side of the line.
42. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
43. Danger zone in 25 KV AC traction is ________ meters from OHE.
44. Danger zone in 1500 DC traction is ________ meters from OHE.
45. After advising the SM about Engine failure, if the Engine is able to move Driver can proceed with one Railway Servant walk in the front and another follow the train with danger signal at a distance not less than ________ Meters on MG/BG.
Read More Section(Indian Railway)
Each Section contains maximum 70 questions. To get more questions visit other sections.
- Indian Railway - Section 1
- Indian Railway - Section 2
- Indian Railway - Section 3
- Indian Railway - Section 4
- Indian Railway - Section 6
- Indian Railway - Section 7
- Indian Railway - Section 8
- Indian Railway - Section 9
- Indian Railway - Section 10
- Indian Railway - Section 11
- Indian Railway - Section 12
- Indian Railway - Section 13