31. The consumption of fuel during idle run per hour is
32. Illuminated A marker of semi-automatic signal means ________.
33. At a C' class staion in two aspect signalling system, ________ and home signals are provided.
34. When the rail failure is rectified by the train can pass at speed
35. Shunting to be done in D/L block section
36. IBS shows ________ light in normal condition.
37. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
38. The White light in point indicator indicates?
39. The speed of Engine on Baharline is ________ kmph
40. On which place the Guard should be presented at the time of train backed from one running line to another line?
Read More Section(Indian Railway)
Each Section contains maximum 100 MCQs question on Indian Railway. To get more questions visit other sections.