81. Modified lower quadrant signaling may be introduced only with section of
82. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
83. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
84. When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
85. While ordering ART/MRV each siren shall be sounded for ________ seconds.
86. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
87. During TFC in double line which authority to serve the driver for train operation?
88. How many systems of working in Indian Railways for train operation?
89. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
90. Single line working inforce on double line.
Read More Section(Indian Railway)
Each Section contains maximum 100 MCQs question on Indian Railway. To get more questions visit other sections.