41. An optimum project schedule implies
42. Choose the wrong statement Time study is used to
43. Time study is used to
44. P.M.T.S. (Predetermined Motion Time Systems) include
45. PMTP (predetermined motion time systems) include
46. A diagram showing the path followed by men and materials while performing a task is known as
47. The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode
48. Standard time is equal to
49. Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer?
50. Routing is essential in the following type of industry
Read More Section(Industrial Engineering and Production Management )
Each Section contains maximum 100 MCQs question on Industrial Engineering and Production Management . To get more questions visit other sections.