81.
The determination of standard time in a complex job system is best done through

82.
Product layout is best suited where

83.
The process layout is best suited where

84.
The type of organisation preferred for an automobile industry, is

85.
At the break-even point,

86.
The technique of value analysis can be applied to

87.
The production cost per unit can be reduced by

88.
Gantt chart is used for

89.
Routing assists engineers in deciding in advance

90.
The objective of time study is to determine the time required to complete a job by

Read More Section(Industrial Engineering and Production Management )

Each Section contains maximum 100 MCQs question on Industrial Engineering and Production Management . To get more questions visit other sections.