Select the incorrect statement.
A. The progress of work in low level method of mound construction is very slow
B. Barge method of mound construction is economical
C. In low level method of mound construction, the area of working is limited
D. In staging method of mound construction, the work is not interrupted even during stormy weather
Answer: Option B
A. The length of design vessel
B. The length of design vessel + 10% clearance between adjacent vessels
C. The length of design vessel + 20% clearance between adjacent vessels
D. Twice the length of design vessel
A. Beam
B. Depth
C. Free-board
D. Draft
A. (i) and (ii) are correct
B. (ii) and (iii) are correct
C. (i) and (iii) are correct
D. (i), (ii) and (iii) are correct
A. (i) and (ii) are correct
B. (ii) and (iii) are correct
C. (i) and (iii) are correct
D. Only (iii) is correct