91. The lower half portion between crown and skew back of the arch, is called
92. A floor constructed with 3 mm marble chips, is known
93. A floor constructed with the 4 to 6 mm marble chips, is known
94. As compared to English bond, double Flemish bond is
95. In case of Raymond pile
96. A stair should not have pitch more than
97. The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called
98. If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is
99. The arrangement of supporting an existing structure by providing supports underneath, is known as
100. While designing a stair, the product of rise and going is approximately kept equal to
Read More Section(Building Construction)
Each Section contains maximum 100 MCQs question on Building Construction. To get more questions visit other sections.