131. An arch may fail due to
132. The process of keeping concrete moist for a certain period after its finishing, is known as
133. A cut in frame of a door to receive the shutter, is called
134. The minimum width of a stair in residential buildings, is
135. Expansion joints in masonry walls are provided if length exceeds
136. The window which is provided on a sloping roof of a building, is called
137. Grillage foundation
138. A wall constructed to resist the pressure of an earth filling, is called
139. In which of the following directions is the strength of the timber maximum?
140. In clay soil
Read More Section(Building Construction)
Each Section contains maximum 100 MCQs question on Building Construction. To get more questions visit other sections.