91. PERT technique of network analysis is mainly useful for
92. In India, are prefabricated components costlier than those of traditional cast-in-situ items that the prefabricated components replace?
93. What estimate would you give for the variance in above problem ?
94. Mobilization advance up to 10% of the cost of work is given to a contractor
95. Which of the following is not a PERT event?
96. During the construction period, price variation clause in contracts caters to
97. In PERT analysis, the time estimates of activities and probability of their occurrence follow
98. At a work site, statistical quality control of concrete means
99. Pick up the incorrect statement from the following:
100. Pick up the PERT event from the following:
Read More Section(Construction Planning and Management)
Each Section contains maximum 100 MCQs question on Construction Planning and Management. To get more questions visit other sections.