92.
In India, are prefabricated components costlier than those of traditional cast-in-situ items that the prefabricated components replace?

94.
Mobilization advance up to 10% of the cost of work is given to a contractor

96.
During the construction period, price variation clause in contracts caters to

97.
In PERT analysis, the time estimates of activities and probability of their occurrence follow

98.
At a work site, statistical quality control of concrete means

99.
Pick up the incorrect statement from the following: