51. For which of the following materials, the output of power shovels for a fixed shovel size will be maximum
52. The original cost of an equipment is Rs.10,000. Its salvage value at the end of its total useful life of five years is Rs. 1,000. Its book value at the end of two years of its useful life (as per straight line method of evaluation of depreciation) will be
53. Crash project duration is obtained by summing the
54. Mile Stone charts were invented in the year of
55. Which one of the following represents an activity?
56. The part of a derrick crane include
(i) Mast
(ii) Boom
(iii) Bull wheel
(iv) Jack
which of these statements are correct?
(i) Mast
(ii) Boom
(iii) Bull wheel
(iv) Jack
which of these statements are correct?
57. For excavating utility trenches with precise control of depth, the excavation equipment used is
58. Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?
59. Power stations are generally treated as
60. If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then
Read More Section(Construction Planning and Management)
Each Section contains maximum 100 MCQs question on Construction Planning and Management. To get more questions visit other sections.