21. While scheduling a project by C.P.M.
22. Final technical authority of a project lies with
23. The technique for establishing and maintaining priorities among the various jobs of a project, is known
24. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
25. Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event 2, is
26. The three time estimates for the activities of the network shown in the given figure are shown above their arrows. The earliest expected time for the event 4, is
27. Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
28. Which one of the following represents an event?
29. The reduction in project time normally results in
30. In the given figure, the network of a project represents
Read More Section(Construction Planning and Management)
Each Section contains maximum 100 MCQs question on Construction Planning and Management. To get more questions visit other sections.