53.
In a syphon aqueduct

54.
For an annual flood series arranged in descending order of magnitude, the return for a magnitude listed at position period m in a total data N is

57.
A fall in a canal bed is generally provided, if

60.
The depth of water required to bring the soil moisture content of a given soil upto its field capacity is called

Read More Section(Irrigation Engineering)

Each Section contains maximum 100 MCQs question on Irrigation Engineering. To get more questions visit other sections.