51. Pick up the correct statement regarding drilling a tunnel from the following:
52. Pick up the correct statement from the following:
53. If ‘N’ is the number of shafts used, then the total number of faces available for attacking the excavation and construction in tunnels are
54. For highways, tunnelling is preferred to if the open cut exceeds:
55. Forepoling method is generally adopted for tunnelling in:
56. A tunnel is found more advantageous as compared to the alternate routes because it:
57. The needle beam method of tunnelling
(i) Is suitable for soils in which roof can stand for few minutes without support
(ii) Is suitable for brick lining
(iii) Is suitable for concrete lining
(iv) Requires large number of trench jacks
(i) Is suitable for soils in which roof can stand for few minutes without support
(ii) Is suitable for brick lining
(iii) Is suitable for concrete lining
(iv) Requires large number of trench jacks
58. Concrete lining is provided concurrently with the driving operation in case of
59. In “full face” method of constructing tunnels, the first operation relates to
60. The following operations are generally employed for tunnelling in hard rock.
1.Removing ground water,
2.Loading holes and firing the explosive
3.Setting up and drilling
4.Grouting and lining
5.Removing muck
6.Ventilation and removing explosion dust
The correct sequence is:
1.Removing ground water,
2.Loading holes and firing the explosive
3.Setting up and drilling
4.Grouting and lining
5.Removing muck
6.Ventilation and removing explosion dust
The correct sequence is: