96.
In sewers designed with self cleansing velocity,

99.
Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for

100.
A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is

Read More Section(Waste Water Engineering)

Each Section contains maximum 100 MCQs question on Waste Water Engineering. To get more questions visit other sections.