13.
The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is

19.
The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called

Read More Section(Waste Water Engineering)

Each Section contains maximum 100 MCQs question on Waste Water Engineering. To get more questions visit other sections.