91. Fresh sewage is generally
92. The sewage is pumped up
93. The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is
94. Bottom openings 15 cm × 15 cm in the standing baffle wall are provided
95. Ventilating shafts are provided to a sewer line at every
96. The gradient of sewers depends upon
97. The laying of sewers is done with
98. Pick up the correct statement from the following:
99. Pick up the correct statement from the following:
100. The sewer which received discharge from two or more main sewers, is known as
Read More Section(Waste Water Engineering)
Each Section contains maximum 100 MCQs question on Waste Water Engineering. To get more questions visit other sections.