91. If an unexplained variation is 350050 and total variation is 700505, then coefficient of determination would be
92. Considering relationship of variables, relationship in which activity cost is included in dependent variable, which has similar cost driver is classified as
93. Method which considers lowest and highest values of cost driver and cost within relevant range is called
94. Vertical dashed line in graphical representation of cost function represents the
95. In dependent variable cost pool, relationship between individual cost items and cost drivers can be classified as
96. Value, which measures that how large is value of standard error in relevance to value of estimated coefficient is termed as
97. Chances of cost to be considered as variable are more, if the
98. If actual result is $25000 and flexible budget amount is $11000, then flexible budget amount is
99. Flexible budget variance for revenues of company is classified as
100. If actual selling price is $500, actual result is $250 and actual units sold are 350, then selling price variance will be
Read More Section(Costing)
Each Section contains maximum 100 MCQs question on Costing. To get more questions visit other sections.