31. Elapsed time, between initiating a query and receiving a response is called
32. During the system study, the executive vice-president and the other managers exercise their responsibility of
33. Which of the following is (are) not a tool for Application Prototyping?
34. Data manipulation language (DML)
35. The set of. instructions for how to tie a bow is an example of the _____Structure.
36. Which of the following appropriately explains the desirable characteristic of good system design?
37. An example of a hierarchical data structure is
38. On a systems flowchart, the online manual keeping of input data is identified by using the
39. Which of the following is not a characteristic of good test data
40. In the system concepts, term Integration
Read More Section(System Analysis and Design)
Each Section contains maximum 100 MCQs question on System Analysis and Design. To get more questions visit other sections.