11. A power transformer is usually rated in
12. Which of the following is the essential requirement of peak load plant?
13. In an interconnected system, the diversity factor of the whole system
14. Maximum demand on a power plant is
15. A company can raise funds through
16. Which of the following are not repayable after a stipulated period ?
17. For any type of consumer the ideal tariff is
18. Which of the following is not an operating cost ?
19. Salvage value of the plant is always
20. Can generate power at unpredictable or uncontrolled times,
Read More Section(Economics of Power Generation)
Each Section contains maximum 100 MCQs question on Economics of Power Generation. To get more questions visit other sections.