71. Interchange point of Central and Western railway is ________.
72. Signal failure advised to the driver through the station in rear will be inform
73. What will be distance between fire affected train and rest of the train ?
74. Goods train without brake van shall not be run during ________.
75. What will be the speed of second train running on T/C 602?
76. High flood level mark shall be painted in
77. In case of block forward, private number of ________ station is written on shunting authority.
78. Signal sighting committee consists of TI, SI/PWI and ________.
79. In case of 1 in 100 rising gradient, ________ siding is provided.
80. When signal is not visible from minimum sighting distance, ________ signal is provided.
Read More Section(Indian Railway)
Each Section contains maximum 100 MCQs question on Indian Railway. To get more questions visit other sections.