81. To start the train from a line with common starter, ________ authority is issued.
82. To start a train from unsignalled line ________ authority is issued.
83. To receive a train on unsignalled line, ________ authority is issued.
84. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
85. In automatic block system SL, the signal that can be dispensed with is
86. The maximum speed of the assistance train to be sent on T/A 602
87. ________ tail board will be used is EMU train.
88. During emergency, in the absence of tail board ________ can be used with the DRM.
89. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
90. Number of train signal register of double line is ________.
Read More Section(Indian Railway)
Each Section contains maximum 100 MCQs question on Indian Railway. To get more questions visit other sections.