101. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
102. Capacity of a slip siding is ________
103. Normal condition of automatic stop signal is ________.
104. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
105. The speed of a Trolley is
106. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
107. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
108. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
109. The Driver of goods train must stop his train as close as possible to ________.
110. Written authority received to pass approach stop signal.
Read More Section(Indian Railway)
Each Section contains maximum 100 MCQs question on Indian Railway. To get more questions visit other sections.