51. Shunt signal is a ________ signal.
52. Distant signal is a ________ signal.
53. Calling on signal is a ________ signal.
54. During shunting, outer, home and ________ signals are not taken off.
55. Distance between two automatic signals is called as ________.
56. 400 meters beyond the home signal of a C' class station is called as ________.
57. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
58. Time taken by train running at MPS is called as ________.
59. Time taken by train running at booked speed is called as ________.
60. In double Distant signalling, outermost signal is called as ________.
Read More Section(Indian Railway)
Each Section contains maximum 100 MCQs question on Indian Railway. To get more questions visit other sections.