41.
Which project demonstrated successful use of tunnel boring machines in fractured rock conditions?

42.
In the La Conchita landslide (USA), what was the dominant triggering factor?

43.
What major challenge was encountered in the El Teniente Mine tunnel project in Chile?

44.
Which Indian dam faced controversy due to resettlement and geological risks?

45.
What mitigation method was implemented at the Vajont Dam post-failure?

46.
Which factor contributed most to the failure of the Highland Towers (Malaysia)?

47.
In the Metro Tunnel Project of Melbourne, what tool was used to monitor ground movement?

48.
What lesson was learned from the Vajont disaster regarding geological surveys?

49.
What kind of foundation was used for the Millau Viaduct in France?

50.
What key monitoring system was used in the Hong Kong-Zhuhai-Macau Bridge project?

Read More Section(Case Studies and Applied Geological Engineering Projects)

Each Section contains maximum 100 MCQs question on Case Studies and Applied Geological Engineering Projects. To get more questions visit other sections.