81. What was a key reason for slope instability during the Malin Landslide (Maharashtra, 2014)?
82. What geological factor led to construction delay in the Atal Tunnel project?
83. In the case of the Three Gorges Dam, what major geological concern was addressed during planning?
84. Which Indian project required rock bolting and shotcrete to stabilize hill slopes near roadways?
85. What monitoring method was used in the Sikkim Hydro Project to track tunnel deformation?
86. Which bridge had to consider foundation on weathered schist and required deep piling?
87. What was a key cause of failure in the St. Francis Dam (1928)?
88. In the Banihal-Qazigund railway tunnel, what was the main hazard encountered?
89. Which dam construction faced challenges due to uplift pressure beneath its base?
90. The primary reason for tunnel collapse in Hallands�s Tunnel (Sweden) was:
Read More Section(Case Studies and Applied Geological Engineering Projects)
Each Section contains maximum 100 MCQs question on Case Studies and Applied Geological Engineering Projects. To get more questions visit other sections.