11.
What is the key concern with limestone terrain for heavy construction?

12.
Which geophysical method is effective in determining subsurface rock layers?

13.
In foundation design, why is weathering of rocks a concern?

14.
What is the major risk when building tunnels in sedimentary rock with dip towards the face?

15.
Which method is commonly used for improving weak ground in construction sites?

16.
What is the primary geological hazard considered when selecting a tunnel route?

17.
Which type of foundation is preferred on soft soil with low bearing capacity?

18.
A geological survey for a bridge site must include:

19.
The most common issue with shale as a foundation material is:

20.
Why is geological cross-section important in construction?

Read More Section(Engineering Geology for Construction)

Each Section contains maximum 100 MCQs question on Engineering Geology for Construction. To get more questions visit other sections.