11. If there were 'n' workers and 'n' jobs, there would be
12. The merits of a well designed layouts includes
13. Priority queue discipline may be qualified as
14. Which of the following factors affects the process design decisions?
15. Which of the cost estimates and performance measures are not used for economic analysis of a queueing system?
16. Match the items of List I with the items of List II regarding operations research models and their bases of categorisation and indicate the code of their correct matching.
List-I (Type of Model)
List-II (Basis of Categorisation)
a. Analogue model
1. Nature of environment
b. Descriptive model
2. Method of getting the solution
c. Deterministic model
3. Structure
d. Simulation model
4. Utility
List-I (Type of Model) | List-II (Basis of Categorisation) |
a. Analogue model | 1. Nature of environment |
b. Descriptive model | 2. Method of getting the solution |
c. Deterministic model | 3. Structure |
d. Simulation model | 4. Utility |
17. The correct sequence of operations in production planning and control is
18. An activity that consumes no time but shows precedence among activities is known as
19. Match the items of List I with those of List II.
List-I
List-II
a. $$\overline X $$ Chart
1. Sampling risks measurement
b. C Chart
2. Potential capability measurement
c. OC Curve
3. Variable measurement
d. 6σ Chart
4. Attribute measurement
List-I | List-II |
a. $$\overline X $$ Chart | 1. Sampling risks measurement |
b. C Chart | 2. Potential capability measurement |
c. OC Curve | 3. Variable measurement |
d. 6σ Chart | 4. Attribute measurement |
20. Quality in manufacturing means that at a . . . . . . . ., all production must be within specification limits and the . . . . . . . . Variation from the nominal, the better the quality.