71. Which of these reasons to keep inventory will improve flexibility?
72. Given
The above diagram is related with
The above diagram is related with
73. SPT means
74. Basic Time computed by
75. Match the following
List-I (Element of production)
List-II (Elements)
a. Control of Due dates
1. Cribes
b. Control of Material
2. EOQ
c. Control of Quality
3. SQC
d. Control of Tooling
4. Scheduling
List-I (Element of production) | List-II (Elements) |
a. Control of Due dates | 1. Cribes |
b. Control of Material | 2. EOQ |
c. Control of Quality | 3. SQC |
d. Control of Tooling | 4. Scheduling |
76. Statistical Quality Control includes
77. Heuristic method may be used in
78. Types of Building includes
79. This figure is an example of
C
D
A
E
F
G
H
J
I
C | D | A |
E | F | G |
H | J | I |
80. Match the following
List-I (Types of Card)
List-II (Features)
a. Move card
1. For handling the components
b. Inspection card
2. Rejection
c. Bin card
3. Stores
d. Route card
4. Process Engineer
List-I (Types of Card) | List-II (Features) |
a. Move card | 1. For handling the components |
b. Inspection card | 2. Rejection |
c. Bin card | 3. Stores |
d. Route card | 4. Process Engineer |
Read More Section(Product and Brand Management)
Each Section contains maximum 100 MCQs question on Product and Brand Management. To get more questions visit other sections.