101. Dispatching
102. Material handling in automobile industry is done by
103. Time study is carried out
104. Work study is most useful
105. In the cost structure of a product, the selling price is determined by the factors such as
106. Replacement studies are made on the following basis
107. Simplex method is the method used for
108. The main disadvantage of line organisation is
109. A systematic job improvement sequence will consist of
110. The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store
Read More Section(Industrial Engineering and Production Management )
Each Section contains maximum 100 MCQs question on Industrial Engineering and Production Management . To get more questions visit other sections.