121.
One time measurement unit (TMU) in method time measurement system equals

122.
The main object of scientific layout is

123.
The most important function of inventory control is

124.
The average time recorded by work study man for an operation is called

125.
Merit Rating is the method of determining worth of

126.
Which one of the following techniques is used for determining allowances in time study?

127.
The critical path of a network represents

128.
Job evaluation is the method of determining the

129.
Merit rating is the method of determining the

130.
Which of the following is independent of sales forecast?