21.
The difference between the time available to do the job and the time required to do the job, is known as

22.
In A-B-C analysis, which class of items are generally large in number?

23.
Which one of the following chart gives simultaneously information about the progress of work and machine loading?

24.
The important file in making a PERT is

25.
Which of the following layouts is suited for mass production?

26.
A dummy activity in a net work diagram

27.
An activity of the project is graphically represented by ________ on the network diagram.

28.
Which of the following are the guidelines for the construction of a network diagram?

29.
Which of the following statement is correct about the network diagram?

30.
Valve analysis is particularly of interest when