21.
One time measurement unit (TMU) in method time measurement system equals

22.
The main object of scientific layout is

23.
The most important function of inventory control is

24.
The average time recorded by work study man for an operation is called

25.
Merit Rating is the method of determining worth of

26.
Which one of the following techniques is used for determining allowances in time study?

27.
The critical path of a network represents

28.
Job evaluation is the method of determining the

29.
Merit rating is the method of determining the

30.
Which of the following is independent of sales forecast?

Read More Section(Industrial Engineering and Production Management )

Each Section contains maximum 100 MCQs question on Industrial Engineering and Production Management . To get more questions visit other sections.