61. The two bin system is concerned with
62. Work study is concerned with
63. Activity slack or float of any event on a PERT/CPM chart is represented by
64. Acceptance sampling is widely used in
65. Dummy activities are used to
66. The time which results in the least possible direct cost of an activity is known as
67. When slack of an activity is negative
68. When slack of an activity is positive
69. If TL is the largest allowable event occurrence time, total activity slack (s) is equal to
70. Tick the odd man out