81. Break-even analysis consists of
82. PERT analysis is based on
83. Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it
84. A CPM family includes
85. M.T.M. is used to
86. In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if
87. The main objective of work measurement is to
88. Which of the following equations is not in conformity with others?
89. The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time and tn = Most likely time)
90. Acceptance sampling is used in
Read More Section(Industrial Engineering and Production Management )
Each Section contains maximum 100 MCQs question on Industrial Engineering and Production Management . To get more questions visit other sections.