91. Abbreviated work factor data is applied for
92. The allowed time for a job equals standard time plus
93. The type of layout used for manufacturing steam turbines, is
94. A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is
95. The type of organisation preferred for a steel industry, is
96. The bonus increases in proportion to the increase in efficiency. This statement applies to
97. Critical path on PERT/CPM chart is obtained by joining the events having
98. Critical path method
99. The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is known as
100. The standard time for a job is