41. PERT is the
42. PERT requires
43. PERT stands for
44. The factors which are to be considered while developing a good wage incentive plan will include
45. In the Halsey system of wage incentive plan, a worker is
46. If ‘F’ is the fixed cost, ‘V’ is the variable cost per unit (or total variable costs) and ‘P’ is the selling price of each unit (or total sales value), then break-even point is equal to
47. Under the Apprenticeship Act
48. The disadvantage of product layout is
49. Pick up the correct step used for scheduling a project by C.P.M.
50. The amount deducted from the salary of workers towards employee’s provident fund is
Read More Section(Industrial Engineering and Production Management )
Each Section contains maximum 100 MCQs question on Industrial Engineering and Production Management . To get more questions visit other sections.