51. Job enrichment technique is applied to
52. A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called
53. In inventory control, the economic order quantity is the
54. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be
55. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be
56. In crash program for a project
57. Graphical method, simplex method, and transportation method are concerned with
58. Emergency rush order can be pushed more effectively in
59. TMU in method time measurement stands for
60. Slack represents the difference between the