61. The period of three months ending on the 31st March, 30th June, 30th September and 31st December called
62. The outlets from a mine are under the sole control of . . . . . . . .
63. Every automatic contrivance and every brake shall be tested once atleast in every . . . . . . . . days, by raising each cage or other means of conveyance, inturn, to pass the last control point above the top most landing.
64. A shot hole or blast hole or part there of remaining after being charged with explosive and blasted and which is not known to be misfired shot called . . . . . . . .
65. Who is responsible for effective implementation of safety management plan.
66. It is the duties and responsibility of owner, intaking preventive and protective measure the owner shall arrange for regular assessment of the risk and, dealing with it the following order of priority.
67. If every mine, where shaft is used for lowering or raising of person . . . . . . . . atleast number of winding ropes stocked ana kept in store.
68. At the top of every inclined plane at least . . . . . . . . is provided to arrest tubs from runny out of control.
69. Every track where the haulage is effected by means of mechanical power or gravity, the safety contrivance fitted there on shall be examined carefully atleast once in every . . . . . . . . days.
70. When a mine has been opened, the owner, agent or manager shall communicate the date of opening to