71. In sinking shaft drilling is done by
72. The coal dust, when suspended in air, is capable of bursting into . . . . . . . . explosion and propagate it.
73. Rate of penetration of compressed air drills varies from . . . . . . . . in hard rocks in m/min.
74. Once the coal dust explosion starts, its propagation needs very small quantity of dust, only 1 gram per c.c of space which is equal to thickness of a layer of ordinary thick paper over a periphery of . . . . . . . .m road way.
75. An evasee is used in exhaustive ventilation is
76. In reversal of air screw fan the quantity of air reduce to nearly . . . . . . . . on reversal.
77. Which drivage is ideal for trackless mining.
78. Over burden heaps should be atleast . . . . . . . .m away from the coal face of a quarry.
79. The weight of soidum phosphate is . . . . . . . .
80. Fire involves live electrical equipment comes under
Read More Section(Drilling and Blasting)
Each Section contains maximum 100 MCQs question on Drilling and Blasting. To get more questions visit other sections.
- Drilling and Blasting - Section 1
- Drilling and Blasting - Section 3
- Drilling and Blasting - Section 4
- Drilling and Blasting - Section 5
- Drilling and Blasting - Section 6
- Drilling and Blasting - Section 7
- Drilling and Blasting - Section 8
- Drilling and Blasting - Section 9
- Drilling and Blasting - Section 10