32.
A 15 m3 dragline is deployed in an O.B. bench of an O.C. mine. It works for 40 days at the rate of 6 hrs per shift and 3 shifts a day. The cycle time, bucket fill factor, and operating efficiency of the dragline are respectively 50 s, 0.8, and 75%. The total volume of O.B. in m3 handled by the dragline is

36.
The following data are provided for a surface mine to be excavated by a shovel:
Production target : 10000 te/shift
Available hours per shift : 6 hrs
Shovel loading cycles per hour : 106
Bank density of the material mined : 2400 kg/m3
Swing factor at 120° swing : 0.91
Bucket fill factor : 0.64
Utilization of available time : 83%
No of working days in a year : 300
No of shifts per day : 3
The annual production target in Mte is

37.
Select the correct order with respect to the core sizes

39.
Which of the following sampling technique is followed during sampling from wagons or dumps in the form of scoop taken at regular intervals?