12.
What is the depth to be achieved for an excavation to be called a coal mine?

14.
As per DGMS Circular 6/2013, mining companies should engage CMPDIL or any educational institution for keeping active surveillance for longer period of time for which of the below mentioned technology?

16.
As per DGMS stipulation on freshly exposed roof which of the following statement is true in the context of minimum damage due to blasting?

17.
As per extant regulation under CMR 1957 and MMR 1961 what is to be confirmed by the Shotfirer before a shot hole is charged, stemmed and fired?

18.
The provision given on weak immediate roof including supporting lips of ledges adequately by artificial means i.e. by a set of 2 or 3 cross bars duly kept lagged is from which circular?

19.
In order to have appropriate health and safety management system which of the following tool is used?

20.
During roof bolt installation which of the following measures should be kept in mind?