84.
If the survey lines in a traverse done by compass survey are to be now retraced on the ground, then it is necessary to know the following on the date the survey was performed.

88.
While ranging, if right arm is extended to the right side it means . . . . . . . .

Read More Section(Mine Surveying)

Each Section contains maximum 100 MCQs question on Mine Surveying. To get more questions visit other sections.