A haul ramp of 6% grade is to be constructed connecting a bench of 15 m height to the surface. If the cost of ramp construction is 1 million rupees per km, the cost of this ramp construction in million rupees will be
A. 0.25
B. 0.10
C. 2.50
D. 0.50
Answer: Option A