A haul ramp of 6% grade to be constructed connected to a bench of 15 m height to surface. The cost of ramp construction is 1 million rupees per km; the cost of the ramp construction in million ruppes will be . . . . . . . .

Answer & Solution
Correct Answer: Option D
Let's discuss the solution. Join the discussion