An underground panel in a coal mine is being developed on B & P system. The pillar size is 30 m centre to centre and the adjacent galleries are 4 m wide. The percentage of extraction during development is
A. 17.6
B. 19.5
C. 24.9
D. 26.2
Answer: Option C